Safety while working at height remains one of the most critical challenges in modern construction, particularly on complex infrastructure projects involving precast concrete and phased installation works.
We were proud to collaborate with BAM UK & Ireland and DJ Civils Ltd on the Guildford Sewage Treatment Works Relocation project, supplying edge protection systems designed to enhance safety, efficiency, and environmental performance.
The Challenge: Provide Safe, Efficient Edge Protection on Precast Structures
Working at height on precast concrete demands solutions that are fast, secure, and minimally disruptive.
Traditional drilled systems add time, noise, dust, and introduce additional risk. Drilling generates harmful vibration, increasing exposure to Hand-Arm Vibration (HAVS). It also releases Respirable Crystalline Silica (RCS) dust, creating serious health hazards for operatives.
To eliminate these issues, we supplied two proven systems: Non-Drill Edge Protection and King Klamp Edge Protection, delivering safer, faster installation without intrusive drilling.
Non-Drill Edge Protection: Speed Without Compromise
Key Advantages of using this system include:
- No drilling required
- Attaches directly to the lifting irons on precast concrete
- Swift and secure installation process
- Preserves the integrity of the concrete structure
For projects operating to strict timelines, these efficiencies make a meaningful difference.
King Klamp Edge Protection: Versatility Across Site Applications
Construction environments are dynamic, and edge protection systems must adapt accordingly.
- Adaptable across various edge protection applications
- Quick to reposition as work phases progressed
- Reduced labour requirements
- Improved overall workflow efficiency
Reducing Vibration, Noise and Dust Pollution
Beyond safety and speed, both systems delivered important environmental and workforce benefits.
Because neither solution required drilling during installation or dismantling, the project benefited from:
- Reduced vibration levels
- Lower dust generation
- A cleaner and more controlled working environment
- Less noise disruption
On infrastructure projects such as treatment works, where operational sensitivity and environmental considerations are key, these advantages are particularly valuable.
Partnering for Safer, Smarter Construction
To learn more about our full range of working at height innovations, visit:
🌐 www.safesmartaccess.co.uk/product-category/edge-protection-systems/
Looking to eliminate drilling risks on your next precast project?
Speak to our team today to discover how our edge protection systems can improve safety, speed up installation, and reduce environmental impact on your site.



