Delivering Safer Working at Height Solutions for Guildford Sewage Treatment Works

 

Safety while working at height remains one of the most critical challenges in modern construction, particularly on complex infrastructure projects involving precast concrete and phased installation works.

We were proud to collaborate with BAM UK & Ireland and DJ Civils Ltd on the Guildford Sewage Treatment Works Relocation project, supplying edge protection systems designed to enhance safety, efficiency, and environmental performance.

 

The Challenge: Provide Safe, Efficient Edge Protection on Precast Structures

Working at height on precast concrete demands solutions that are fast, secure, and minimally disruptive.

Traditional drilled systems add time, noise, dust, and introduce additional risk. Drilling generates harmful vibration, increasing exposure to Hand-Arm Vibration (HAVS). It also releases Respirable Crystalline Silica (RCS) dust, creating serious health hazards for operatives.

To eliminate these issues, we supplied two proven systems: Non-Drill Edge Protection and King Klamp Edge Protection, delivering safer, faster installation without intrusive drilling.

 

Non-Drill Edge Protection: Speed Without Compromise

Our Non-Drill system is designed to simplify installation while maintaining the highest safety standards.

Key Advantages of using this system include:

By eliminating the need for drilling, installation teams were able to reduce setup time significantly. This streamlined workflow, reduced labour demands, and removed unnecessary secondary processes from the programme.

For projects operating to strict timelines, these efficiencies make a meaningful difference.

 

King Klamp Edge Protection: Versatility Across Site Applications

Construction environments are dynamic, and edge protection systems must adapt accordingly.

Our King Klamp system provided a highly versatile clamping solution suitable for multiple site scenarios.

Why It Made an Impact:

Its flexibility enabled teams to maintain robust fall protection standards while responding quickly to changing site conditions.

 

Reducing Vibration, Noise and Dust Pollution

Beyond safety and speed, both systems delivered important environmental and workforce benefits.

Because neither solution required drilling during installation or dismantling, the project benefited from:

  • Reduced vibration levels
  • Lower dust generation
  • A cleaner and more controlled working environment
  • Less noise disruption

On infrastructure projects such as treatment works, where operational sensitivity and environmental considerations are key, these advantages are particularly valuable.

 

Partnering for Safer, Smarter Construction

The Guildford Sewage Treatment Works Relocation project highlights what can be achieved when contractors and suppliers work collaboratively with safety and efficiency as shared priorities.

At SafeSmart, we are committed to delivering practical, innovative working at height solutions that help contractors to improve on-site safety performance, streamline installation processes, reduce environmental impact, enhance overall project delivery.

We look forward to continuing to support forward-thinking partners who prioritise safe, efficient, and innovative construction practices.

To learn more about our full range of working at height innovations, visit:

🌐 www.safesmartaccess.co.uk/product-category/edge-protection-systems/

Looking to eliminate drilling risks on your next precast project?
Speak to our team today to discover how our edge protection systems can improve safety, speed up installation, and reduce environmental impact on your site.

You Might Also Like