Temporary Bolt Down Handrail Post

Handrail Posts

Temporary Bolt Down Handrail Post

Handrail Posts

The Temporary Bolt Down Handrail Post is a versatile and portable solution for temporary edge protection, walkways, and pedestrian delineation. It is designed to be easily installed and removed, providing a secure and stable handrail system.

This handrail post is specifically designed for temporary applications and can be bolted down for added stability and safety. It is compatible with scaffold couplers, allowing for quick and hassle-free installation. With a height of 1.2 meters, it is suitable for tube and coupler handrails. The handrail itself is made from scaffold tube or similar material with a diameter of 48.3mm, ensuring strength and durability.

  • Temporary bolt down edge protection for slab edges, walkways, pedestrian delineation
  • Handrail to be secured using scaffold coupler
  • 1.2mh to suit tube and coupler handrail
  • Handrail is scaffold tube or similar- 48.3mm od
  • Handrail spacing shall be limited to 2m
  • Complies with the BS EN 13374 standards

Temporary Bolt Down Edge Protection is a secure bolt down edge protection system designed for situations where a permanent or semi-permanent fixing method is required. Using base plates anchored directly into the substrate, this mechanical fix edge protection solution provides maximum stability and load performance.

Ideal as a base plate guardrail system, it is widely used on concrete slabs, decks, and structural edges where non-penetrative systems are not suitable. These fixed edge protection posts deliver a robust, compliant solution for maintaining safe working conditions at height across construction and infrastructure projects.

SKU: 290686-bolt-down
Bolt Down Guardrail Post, 1.2mH
1.2mH
SKU: 210879
Multi Mount Guardrail Post
  • Multi Mount Guardrail Post 1.2mH
SKU: 210878
Multi Mount Guardrail Post 2.0mH

Product Description

The Temporary Bolt Down Handrail Post is a versatile and portable solution for temporary edge protection, walkways, and pedestrian delineation. It is designed to be easily installed and removed, providing a secure and stable handrail system.

This handrail post is specifically designed for temporary applications and can be bolted down for added stability and safety. It is compatible with scaffold couplers, allowing for quick and hassle-free installation. With a height of 1.2 meters, it is suitable for tube and coupler handrails. The handrail itself is made from scaffold tube or similar material with a diameter of 48.3mm, ensuring strength and durability.

  • Temporary bolt down edge protection for slab edges, walkways, pedestrian delineation
  • Handrail to be secured using scaffold coupler
  • 1.2mh to suit tube and coupler handrail
  • Handrail is scaffold tube or similar- 48.3mm od
  • Handrail spacing shall be limited to 2m
  • Complies with the BS EN 13374 standards

Suggested for you

Your solution is just a click away
The Solution Selector will recommend the best access solution for your needs in 30 seconds.
The SafeSmart Difference