Opus is a landmark residential development at Bankside Yards on London’s South Bank. As part of the UK’s first major mixed-use development designed to operate entirely fossil fuel-free, the 50-storey tower is a significant addition to London’s skyline.

With 250 premium apartments planned, the scale of the development presented considerable logistical challenges for the construction team. Main contractor Multiplex needed a reliable vertical access solution that could support workers moving through the building as construction progressed.

ProScaf supplied a 140-metre-high Z-Stair system, providing a dedicated access route throughout the high-rise construction project.

Project Details:

  • Project: Opus – 50-Storey Residential Skyscraper
  • Location: Bankside Yards, South Bank, London
  • Architect: PLP Architecture
  • Main Contractor: Multiplex
  • Completion Date: 2026
  • Scope: 250 apartments
Identifying the challenge

As construction progressed on the 50-storey tower, providing safe and practical access between levels was an important consideration for Multiplex. The height and complexity of the development meant the access system needed to accommodate the changing demands of the construction site, while working within the constraints of a compact riverside location.

At 140 metres high, the solution also needed to balance structural performance with practical installation and handling requirements. Keeping component weights manageable, without compromising the strength and durability required for a demanding construction environment, was a key consideration.

The Solution: ProScaf 140m Z-Stair system

To meet these requirements, ProScaf supplied a modular Z-Stair system reaching 140 metres in height, providing workers with dedicated vertical access throughout the development.

The system combined ProScaf’s modular design with lightweight aluminium components, helping address the practical challenges of installation and handling on a high-rise construction site.

Key features included:

  • Modular configuration: Designed for staged assembly as construction progressed, accommodating the changing requirements of the development.
  • Lightweight aluminium stairs and handrails: Helped reduce overall component weight, making handling and installation more practical at height.
  • Strength and durability: Designed to meet the demands of a busy construction environment.
  • Adaptable installation: The modular system supported assembly throughout the 50-storey structure.

The result was a purpose-suited vertical access solution designed around the scale and logistical requirements of the Opus development.

The Result: Dedicated vertical access across 50 storeys

The 140-metre ProScaf Z-Stair provided Multiplex with a dedicated vertical access route throughout the Opus construction project.

Its modular configuration supported staged installation as the tower progressed, while the lightweight aluminium components helped simplify handling and assembly at height.

For a development of this scale, having a dedicated access system in place was an important part of supporting the movement of workers throughout the building. The project demonstrates how ProScaf’s modular access solutions can be configured to meet the demands of complex, high-rise construction projects