How Severfield Used StepOvers to Simplify Site Movement

The project is a dynamic mixed-use hub, introducing 165 new residential units above the existing roofline while integrating retail and employment spaces on the lower levels. Alongside these structural additions, …
Upgrading Site Access at Atlas Road – From Scaffolding to AdaptaSpan

At SafeSmart Access UK, we partner with forward-thinking construction teams to deliver safer, more efficient access solutions. Our recent project with long-standing client SCS JV at their Atlas Road site …
SafeSmart Stepovers Replace Scaffolding at CMDP’s Test Wood Water Supply Works

The Challenge: An Inefficient and Costly Access Solution CMDP, a key player in civil engineering infrastructure, faced a persistent challenge at the Test Wood Water Supply Works site. Their existing …
Overcoming Complexity in Scaffolding: How Proscaf Transformed a Challenging Project for H&H

In the scaffolding industry, experience can sometimes lead to scepticism – especially when a new system claims to outperform traditional tube and fit solutions. This was the case for Dean …
Maximising Safety and Efficiency: SafeSmart’s Crane Bridge Attachments

In high-rise construction, accessing tower cranes safely and efficiently is a persistent challenge. Climbing to reach the crane cab is a lengthy, time-consuming task, significantly impacting productivity. The need for …
Safe and Efficient Loading: SafeSmart Access Delivers for Dent Steel

At Dent Steel, the need for efficient and safe loading and unloading processes is paramount. Prior to working with SafeSmart Access, Dent Steel Faced a significant challenge when it came …
Spanning Success: SafeSmart’s Modular Solution for HS2

As Europe’s largest infrastructure project, HS2 is set to transform rail travel between London and Birmingham. With such a massive undertaking, the safety and efficiency or workers is paramount. Identifying …
Double-Width Stairway to Success: SafeSmart Elevates Mace’s Safety and Efficiency

In Large-Scale Construction Projects, Every Minute Counts, And Ensuring Worker Safety Is Paramount. Identifying the Challenge For Mace, the challenge was clear; downtime was becoming a significant issue with …
SafeSmart Helps the A14 Build Safe

https://www.safesmartaccess.co.uk/wp-content/uploads/sites/5/2024/09/SSA-CSJV.mp4 The Challenge The A14 A Road Project in South Cambridgeshire continues on, with engineering contractor joint Venture Costain Skanska (CSJV) having been awarded the job in 2015. And as …
How Proper Hopper Access Saves Time-Waste

The Challenge Zero Waste is a major joint project between the City of Edinburgh Council and Midlothian Council in Scotland that aims to reduce, well, a waste of waste. Through private …